Intervention carried out for the creation of the guide housing of a sliding door, through a precise cut in the plasterboard false ceiling, with precise workmanship and minimal impact on the existing environment.
The operation required a controlled opening of the false ceiling to allow the insertion and proper alignment of the guide system, ensuring structural stability and seamless integration with the existing finishes.



Execution precision
The cut was performed using specialized tools and preliminary markings to ensure:
- clean, regular edges
- no vibrations or damage to adjacent surfaces
- full preservation of the false ceiling’s structural integrity
Particular care was devoted to the restoration phase, with the opening closed and refinished so that the intervention would be completely invisible once the work was completed..
Cleaning and site management
The intervention was carried out with high standards of order and surface protection, ensuring:
- a fully isolated work area
- effective dust containment
- immediate disposal of debris and waste materials
This approach made it possible to operate even in finished or occupied environments, without causing any inconvenience to the client.

Execution time
Thanks to careful planning and the work of specialized personnel, the operation was completed in a short timeframeensuring fast execution without compromising the final quality.




